Phew. Been a while since I've posted. But I've been busy.....new life back on the west coast! Things are good.
So I finally made some progress on my ski-footwell modification. Since it has arrived in Berkeley, it's been sitting on Kizmuit's deck, longing to go out. Hasn't touched the water yet....mostly, because it has needed two things - a proper place to attach a leash, and a venturi drain. I've been able to address one of the two. Shown below are pics of the foot-bar/leg-leash addition to the footwell modification.
So I took a section of an old paddle shaft, and pared it down to size.....
....then I scribed some notches in the gunnels of the footwell.....
.....and here's the paddle-shaft/foot-bar/leg-leash attachment positioned where I want it......
...a closeup of the slots for the paddle shaft, prepped for a solid epoxy bond.......
.....and here's the carbon fiber patch holding the bar in place......(yes, middle of the night).....
.....oh, and prior to afixing the carbon fiber cloth, I epoxied the part in place.....
....here's a pic of the final ugly fix......
....and yet another. It's not pretty, for sure, but I think that once it is faired and painted, none will be the wiser.
No comments:
Post a Comment